SERVICE
Silverado Engineering provides a comprehensive range of solutions for power system protection and automation in electrical substations and power distribution systems. Our services include engineering, systems integration, and field support to protect the system from equipment damage and maximize the system capabilities. We work closely with our customers to improve their system operation for present and future needs.
POWER SYSTEM PROTECTION
Drawing Design
Breaker Closing and Tripping Scheme
Demolition and Installation Drawing Package
Single Line Diagram, AC/DC Schematic, and Wiring Diagram
Relay Protection Logic and Setting Calculation
Transformer Protection
Bus Protection
Motor Protection
Distribution System Protection
Transmission Line Protection
Generation Protection
Protection Scheme
Arc Flash Protection
Zone Selective interlocking (Fast Bus Protection)
California Rule 21
Synchronization
Testing and Commissioning
POWER SYSTEM ANALYSIS
Coordination Study
Short Circuit Study
Arc Flash Study NFPA 70E
Load Flow Study
POWER SYSTEM AUTOMATION
SCADA with Modbus, DNP3, IEC61850, SEL Mirrored Bits, etc
Event Collection
Remote Control Capability
System Alarming
Annunciation
User Management and Password Management
Human Machine Interface (HMI)
Communication Network
Automation Scheme
Automatic Transfer Scheme
Direct Transfer Tripping
Automatic Synchronization
Load Shredding
Testing and Commissioning
Microgrid Control
Grid Connected mode
Automatic Generation Control - Droop Mode
Peak Shaving
Power Factor Control System (PFCS)
Island Detection and Decoupling
Anti Islanding
Islanding - IEEE 1547-2018 Ride Through
81RF Seamless Islanding
Islanded mode
Load and Generation Shedding/Runback
Contingency-based/Frequency-Based load shedding
Automatic Generation Control - Isochronous Mode
Volt/VAR Algorithms
Synchronization
Black start
Microgrids Reconfiguration
DER Starting
Load Reacceleration.
BESS Charging Strategy
Strategy 1
Ensures a certain minimum level of charge in the BESS
Strategy 2
Capitalizes on periods of high PV output to charge the BESS more aggressively